Thanks. Still got a lot of work to do it it yet. Got to build a roof for it, one of those safety cage ladders to go from walkway to roof (on the right) where there will be heat exchanger/conditioning like equip. (they use a kiln to heat a rotating drum that the cement passes thru. one mthod used)
Still more conveyors to add to this entire facility. PLus some more buildings. I'm almost wishing I had built this facility as a showpiece as far as having more depth and warehouse for bagged cement,trucks,parking lots,office,etc. This cement plant was conceived with space left over beside the railyard. It's hard to predict your interests and all ideas on paper before laying track. (welcome to the club, i'm not the first) I'm at the point where it isn't too late to rip track up and redesign it but for time,expense and effort (will it truly flow perfectly like the layouts in MR) I'm still hoping the track arangment will look better once all structures in place and scenery. Again some of my newly acquired structures weren't bought until afterwards.